Resonance Control Panel
1. Product Hero
RES‑CP — Resonance Control Panel
Engineered to control structural and panel resonances in high‑performance audio rooms — at just 50mm depth.
Key Highlights
- Controls resonance‑driven colouration
- Improves clarity, articulation and low‑mid definition
- Predictable, repeatable performance
- Optimised for concealed installation behind fabric systems
Primary CTA: Add to Project / Enquire
Secondary CTA: How C‑ATS Works
2. What RES‑CP Does
Engineered to control resonance‑based colouration.
Structural and panel resonances introduce:
- low‑mid bloom
- loss of articulation
- masking of detail
- uneven response across the room
RES‑CP reduces these resonances, stabilising the low‑mid region and improving clarity.
3. Shallow‑Depth Engineering
Resonance control at only 50mm depth.
Most resonance‑control systems require 100–200mm of depth.
RES‑CP delivers effective resonance control at 50mm, preserving:
- room volume
- seating positions
- high‑performance room geometry
4. How RES‑CP Works
Purpose‑built resonance‑control engineering.
RES‑CP uses a tuned internal structure to:
- reduce resonance‑driven colouration
- stabilise low‑mid behaviour
- improve clarity and articulation
- support predictable room performance
5. Integration Options
Ideal for:
- home cinemas
- listening rooms
- studios
- high‑performance residential media rooms
Optimised for concealed installation behind fabric systems.
6. Technical Specifications
- Depth: 50mm
- Acoustic Target: Structural and panel resonances
- Construction: Tuned internal structure
- Finish: Designed for concealed use
- Mounting: Wall installation
Marine Compliance
Standard RES‑CP panels are not constructed from IMO/SOLAS‑compliant materials.
It is the responsibility of the project specifier to determine whether IMO/SOLAS‑compliant materials are required for their vessel or project.
Marine‑compliant versions of RES‑CP, using materials aligned with IMO/SOLAS fire‑safety requirements, are available on a project basis.
CTA: Learn more about Marine Fire‑Safety & Material Compliance
7. Final CTA
Primary CTA: Add to Project / Enquire
Secondary CTA: Start Your Project